Tell us the scope
Share the location, what needs doing, and your preferred timing. Estimates are fine.
Putting the right-of-way back once the pipe is in the ground.
Trench settlement repair, recontouring, decompaction, and topsoil replacement on pipeline rights-of-way in northeast BC.

Restoration starts when construction moves on. Trench lines settle, work areas are compacted, and topsoil has to go back where it came from. We handle the earthworks, supply fill and topsoil from our own pits, and work to the restoration requirements set by the pipeline company and its environmental team.
Seeding, agronomic prescriptions, and landowner sign-off belong to the pipeline company’s environmental team and its specialists. We do the ground work and coordinate with them on the sequence, so topsoil goes back on a surface that is ready for it.
We supply aggregate and build and maintain access for pipeline construction and gas plants across the region. The same equipment and pits carry through to restoration.
Share the location, what needs doing, and your preferred timing. Estimates are fine.
We discuss access, materials or equipment, and the information needed for your job.
Agree the scope and schedule with dispatch before making plans around the work.
Yes. Send the locations and what has settled, and we can discuss the repair.
Revegetation is specialist work. We coordinate with the seeding contractor so the ground is ready for them.
Tell us the land use and the landowner conditions. We can discuss the equipment and the sequence the restoration plan calls for.
A location and a short description are enough to start.